Recent changes

Jump to navigation Jump to search

Track the most recent changes to the wiki on this page.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 21:05, 6 November 2025
 
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

4 November 2025

N    18:08  Server Room (Flamenco) diffhist +986 AdminIsidore talk contribs (Created page with "The '''Server Room''' is the single most critical component of Project: Flamenco. It is not viewed as a simple utility, but as the "engine" or "artificial sun" of the entire system. Its primary function within the project is not computation, but the generation of '''waste heat''', which is the project's most valuable internal resource. All other systems are designed to capture and leverage 100% of this thermal output. The heat is captured in two forms: 1. '''Hot...")
N    18:07  Integrated Pest Management (Maria) diffhist +1,009 AdminIsidore talk contribs (Created page with "'''Integrated Pest Management (IPM)''' is the "dynamic" or "living" pest control strategy for Project: Maria. Due to the closed-loop aquaponics system (which is highly sensitive to toxins) and the server room (where airborne chemicals are a risk), traditional chemical pesticides are forbidden. Instead, IPM focuses on creating a stable, balanced ecosystem by using '''biological controls.''' === Key Strategies...")
N    18:07  Loofah Filter Cultivation (Maria) diffhist +901 AdminIsidore talk contribs (Created page with "'''Loofah (Luffa) Filter Cultivation''' is a key component of Project: Maria's "internalized inputs" principle. The Loofah gourd is a vining plant that is grown in the greenhouse. When harvested and dried, the gourd's fibrous interior forms a tough, porous, 3D sponge. === System Function === 1. '''Filter Production:''' These dried loofah matrices are cut into flat sheets. 2. '''Dehydrator Use:''' The sheets are used as the food...")
N    18:07  Waste Heat Food Dehydrator (Isidore) diffhist +863 AdminIsidore talk contribs (Created page with "The '''Waste Heat Food Dehydrator''' is a large, insulated cabinet designed to dehydrate food using "free" energy from the Server Room. === System Design === * '''Heat Source:''' The hot, dry air (90-110°F) exhausted from the server racks is ducted directly into the dehydrator. * '''Food Safety Filter:''' Before the air touches the food, it must pass through a final "polishing" filter to remove any server room dust or particulates. This filte...")
N    18:07  Power Generation & Storage (Isidore) diffhist +1,054 AdminIsidore talk contribs (Created page with "This article describes the overall "electrical grid" for Project: Flamenco, which is designed for 24/7 redundancy by "stacking" multiple generation sources. === Generation Sources === 1. '''Solar Panel Array (Primary):''' Provides the main bulk of electrical power during the day. 2. '''Stirling Engine Array (Secondary/Night):''' The hybrid engines provide two forms of power: * **Mechanical:**...")
N    18:06  Centrifugal Clutch (Isidore) diffhist +950 AdminIsidore talk contribs (Created page with "The '''Centrifugal Clutch''' is the key mechanical component that makes the Stirling Engine's mechanical drive possible. === The Problem (Low Torque) === The LTD Stirling engine produces very low torque (twisting force), especially at startup. It does not have the "grunt" to start a water pump from a dead stop and would stall. === The Solution (Clutch) === The centrifugal clutch (similar to a go-ka...")
N    18:06  Stirling Engine Array (Isidore) diffhist +1,148 AdminIsidore talk contribs (Created page with "The '''Stirling Engine Array''' is a key power-generation component of Project: Isidore. It is a "Low-Temperature Differential" (LTD) heat engine. Its function is to convert the waste heat from the server room directly into mechanical energy, which is then converted into electrical energy. === System Design === * '''Hot Side:''' Heated by the hot coolant loop from the server room. * '''Cold Side:''' Cooled by the stable, cold water from t...")
N    18:06  Liquid-to-Liquid Heat Exchanger (Isidore) diffhist +1,068 AdminIsidore talk contribs (Created page with "A '''Liquid-to-Liquid Heat Exchanger''' is a device that allows heat to be transferred between two liquid loops without the liquids ever mixing. In Project: Flamenco, this is typically a compact "brazed plate" exchanger. This component is critical for isolating "dirty" or "technical" water loops from "clean" or "biological" ones. === Key Applications === * '''Stirling Engine (Hot Side):''' Transfers heat from the "technical" server coolant loop to the "clean" water...")
N    18:06  Central Thermal Battery (Isidore) diffhist +1,147 AdminIsidore talk contribs (Created page with "The '''Central Thermal Battery''' (also known as the "cistern") is the single most important "anchor" in the entire Project: Flamenco system. It is a large, subterranean water tank, buried 6-10 feet underground to maintain a stable, year-round temperature (approx. 64°F). This massive, stable water volume serves as the facility's "thermal anchor" or "battery." === System Functions === 1. '''Water Supply:''' It is the primary reservoir for the facility, fed by th...")
N    18:06  Heat Recovery System (Isidore) diffhist +1,024 AdminIsidore talk contribs (Created page with "The '''Heat Recovery System''' is the "circulatory system" of Project: Isidore. It is the complete network of ducts, pipes, and exchangers responsible for capturing 100% of the waste heat from the Server Room and distributing it to other systems. It consists of two main loops: 1. '''Air Loop (Gaseous):''' * '''Source:''' Hot server fan exhaust. * '''Use:''' Ducted directly to the Waste Heat Food Dehydrator (Isidore)|Waste Heat...")
N    18:05  Biowall Filtration System (Maria) diffhist +1,554 AdminIsidore talk contribs (Created page with "The '''Biowall Filtration System''' is the primary, "living" air filter for the entire warehouse. It is nicknamed "The Mangrove" because it functions as a living, breathing ecosystem that cleans the air and water. === Design === The biowall is a large, vertical, hydroponic "living wall" built along the interior face of the warehouse. * '''Active Filtration:''' It is an "active" biowall, meaning fans at the bottom vents pull the entire warehouse air volume ''through'' th...")
N    18:05  North-Facing Roof Monitor (Isidore) diffhist +782 AdminIsidore talk contribs (Created page with "The '''North-Facing Roof Monitor''' is an architectural feature, also known as a "clerestory window," designed to provide passive lighting to the building's interior. Instead of a simple skylight (which would dump massive heat into the building), the roof monitor is a raised "box" on the roof. * The '''South-facing side''' is opaque and covered with solar panels to block the high, hot summer sun. * The '''North-facing side''' is all glass...")
N    18:05  Rainwater Harvesting System (Isidore) diffhist +626 AdminIsidore talk contribs (Created page with "The '''Rainwater Harvesting System''' is the "Blue Roof" component of the "Blue-Green-Solar Roof." It is designed to capture 100% of the rainwater that falls on the property. The system consists of a network of gutters and pipes that collect the rainwater after it has been pre-filtered by the Green Roof. This clean water is then channeled into the Central Thermal Battery, a massive subterranean cistern. This...")
N    18:05  Green Roof (Maria) diffhist +822 AdminIsidore talk contribs (Created page with "The '''Green Roof''' is a "living" layer of shallow-rooted, drought-tolerant plants (like succulents and sedums) covering the warehouse roof. It is part of the "Blue-Green-Solar Roof" and serves two critical functions for Project: Flamenco: 1. '''Thermal Insulation:''' The layer of soil and plants acts as a massive insulating blanket, absorbing solar radiation and preventing the sun from heating the warehouse roof. This drastically reduces the building's cooling l...")
N    18:04  Solar Panel Array (Isidore) diffhist +790 AdminIsidore talk contribs (Created page with "The '''Solar Panel Array''' is the primary electrical generation system for Project: Flamenco. It is a key component of the "Blue-Green-Solar Roof" concept. The panels are mounted on the warehouse roof, but are integrated with the other roof systems to create a powerful synergy: 1. The panels are mounted *above* the Green Roof. 2. The "evapotranspiration" (sweating) from the green roof's plants creates a micro-climate of cooler air directly...")
N    18:04  Aquaponics System (Maria) diffhist +1,106 AdminIsidore talk contribs (Created page with "The '''Aquaponics System''' is the primary food-production and nutrient-cycling system for Project: Flamenco. It combines aquaculture (raising fish) with hydroponics (growing plants in water). === System Role === 1. '''Food Production:''' Grows both fish and a wide variety of plants and herbs. 2. '''Nutrient Source:''' The nutrient-rich water from the fish tanks is the primary "fertilizer" for the biowall and the aquaponic "ri...")
N    18:04  Greenhouse & Shadehouse (Maria) diffhist +1,076 AdminIsidore talk contribs (Created page with "The '''Greenhouse & Shadehouse''' component is a hybrid "zoning" strategy for the building envelope, designed to work ''with'' the Arizona climate. 1. '''Shadehouse "Moat":''' * '''Location:''' Runs along the long East/West-facing walls. * '''Function:''' Acts as a "thermal shield." A 5-foot-wide space covered in 50-70% shade cloth, it blocks the brutal, low-angle E/W sun from ever hitting the main warehouse wall. * '''Use:''' This cooler, shaded area house...")
N    18:03  AI Orchestration (Flamenco) diffhist +605 AdminIsidore talk contribs (Created page with "The '''AI Orchestration''' layer is the "central nervous system" of Project: Flamenco. It is a planned system, to be built on the GeminiCLI tool. Its function is to monitor, learn, and eventually help manage the dynamic, self-regulating systems of the warehouse. It will integrate sensor data from Project: Isidore (e.g., temperatures, power levels, pump speeds) and Project: Maria (e.g., nutrient levels, humidity, plant growth) to crea...")
N    18:03  Industrial ecology diffhist +1,072 AdminIsidore talk contribs (Created page with "'''Industrial Ecology''' is the core philosophical and engineering principle behind Project: Flamenco. In the context of this project, it is the study of the facility as a "man-made ecosystem." The central tenet is that there is no such thing as "waste," only "misplaced resources." The entire design of Project: Flamenco is an exercise in industrial ecology, where the "waste" output of one system becomes the "food" input for another. === Key Loops === * '''Heat Wa...")
N    18:02  GeminiCLI (Flamenco) diffhist +1,100 AdminIsidore talk contribs (Created page with "The '''GeminiCLI (Flamenco)''' is the specific software tool chosen to serve as the foundation for the AI Orchestration layer of Project: Flamenco. A locally-hosted instance of the Gemini model will be accessed via its command-line interface. This wiki, along with its references, build logs, and (eventually) real-time sensor data, will be used as the primary fine-tuning dataset. The goal is for the GeminiCLI to learn the complex, dyn...")
N    18:02  OODA WIKI:Maria diffhist +1,452 AdminIsidore talk contribs (Created page with "{{Main|Project: Flamenco}} '''Project: Maria''' is the primary sub-project of Project: Flamenco, named for Santa Maria de la Cabeza. It encompasses all organic, biological, and "living" systems. The core function of Project: Maria is to serve as the "lungs, kidneys, and stomach" of the facility. It is responsible for air and water filtration, food production, and internalizing resource loops. It is the "organic" counterpart to the "mechanical" systems of Project:...")
N    18:01  OODA WIKI:Isidore diffhist +2,099 AdminIsidore talk contribs (Created page with "{{Main|Project: Flamenco}} '''Project: Isidore''' is the primary sub-project of Project: Flamenco, named for St. Isidore the Farmer. It encompasses all mechanical, electrical, structural, and "hard tech" systems. The core function of Project: Isidore is to provide the "engine" for the facility—capturing, generating, storing, and converting energy. It is the "mechanical" counterpart to the "organic" systems of Project: Maria. === Core Components === * '''Ene...")
N    18:01  OODA WIKI:Flamenco diffhist +5,437 AdminIsidore talk contribs (Created page with "'''Project: Flamenco''' is a whole-systems design for a self-sufficient, closed-loop warehouse and server facility. The project's core principle is the application of Industrial ecology, where every waste stream (such as heat, water, or CO2) is captured and used as a resource for another component of the system. The project is designed as an integrated "living" system, combining mechanical, organic, and artificial intelligence components to achieve systemic resilien...")